Rural Storage Facility - Future Commercial Development

Site Plan and Road Design

Site and road design, as well as local municipal permitting were all performed by Sloan Engineering and Consulting. This project included future planning for a possible commercial development.

Wendy's on Vine

Dual Drive Thru, Entrance Widening, ADA Sidewalk

Renovations to existing fast food restaurant.  Design of double drive thru (y-lane).  New & improved entrance design and permit processing with KDOT and City of Hays, KS. ADA conformity of new entrance sidewalk.

ESD #4

Fire Station Site Plan

A 3-acre site development for an emergency services district fire and ambulance building with crew quarters. The project involved minor subdivision platting, heritage tree preservation during construction, existing and proposed drainage analysis, site grading and paving, storm drainage system, detention pond, waste water collection to a septic tank, water supply,  and erosion and sedimentation control plan. (while employed by Baker-Aicklen and Associates, Inc.)

City of Leander, TX

Right Turn Lane at Major Intersection

Local congestion at a city arterial and state highway intersection led to a capital improvement project for a new right turn lane to improve traffic flow.  Multiple existing utilities, both wet and dry, were accommodated for in the design.  A subsurface utility engineer was contracted to ensure large electrical and fiber optic lines, in close proximity, would not be impacted by the storm drainage structures.  Pedestrian sidewalks were also designed to comply with current ADA regulations. (Contract engineer for Haynie Consulting, Inc.)

7-11 Gas Station

Water Quality and Detention Redesign

A redesign of the water quality and detention design was required to meet stringent state and local environmental requirements.  This project included grading modifications and an underground Old Castle StormCapture detention system. (while employed by Baker-Aicklen and Associates, Inc.)

CR 280

Roadway Redesign

Grading and drainage redesign for a county road that was projected to have heavy use due to new residential development. Cast-in-place concrete box culverts (box bridge) designed for 100 year storm. (Contract engineer for Haynie Consulting, Inc.)